PORT ORANGE WWTF

PORT ORANGE, FL · 12.0 Million Gallons per Day (MGD) design flow · minor discharger

Risen Water fit

  • The Rippler—Ammonia, Biochemical Oxygen Demand (BOD), Total Suspended Solids (TSS), Nitrogen (TKN)
  • The Channel Panel: Solids / TSS carryover (screening strain)

The call

PORT ORANGE WWTF is failing ammonia limits—The Rippler drives nitrification in the lagoon to pull ammonia down without a capital retrofit.

Who owns the fix

  • Public Works Director
  • Utilities / Water Reclamation Director
  • WWTP / WRF Plant Superintendent
  • City Engineer (named decision-makers + LinkedIn added in the full build)

Proof (last 12 months)

  • Effluent exceedances: Ammonia|BOD, carbonaceous [5 day, 20 C]|Flow, in conduit or thru treatment plant|Nitrogen|Solids, total suspended|Whole effluent toxicity
  • Significant noncompliance: Significant Noncompliance (SNC) Effluent Violation Monthly Average
  • Quarters in significant noncompliance (last 3yr): 5
  • Formal enforcement actions: 2 (last 09/12/2024)
  • Informal enforcement actions: 3
  • Penalties assessed: $19,500 (last 09/12/2024)
  • EPA ECHO (Enforcement and Compliance History Online) record →