GLENDALE WATER RECLAMATION FACILITY

VERO BEACH, FL · 6.0 Million Gallons per Day (MGD) design flow · major discharger

Risen Water fit

  • The Rippler—Biochemical Oxygen Demand (BOD), Nitrogen (TKN)

The call

GLENDALE WATER RECLAMATION FACILITY is exceeding BOD—The Rippler boosts dissolved oxygen and biological breakdown to cut BOD loading.

Who owns the fix

  • Public Works Director
  • Utilities / Water Reclamation Director
  • WWTP / WRF Plant Superintendent
  • City Engineer (named decision-makers + LinkedIn added in the full build)

Proof (last 12 months)