BCUD/SOUTH BEACHES

MELBOURNE BEACH, FL · 8.0 Million Gallons per Day (MGD) design flow · minor discharger

Risen Water fit

The call

BCUD/SOUTH BEACHES is exceeding BOD—The Rippler boosts dissolved oxygen and biological breakdown to cut BOD loading.

Who owns the fix

  • Public Works Director
  • Utilities / Water Reclamation Director
  • WWTP / WRF Plant Superintendent
  • City Engineer (named decision-makers + LinkedIn added in the full build)

Proof (last 12 months)